27 October 2026
A totem is a freestanding, upright sign, and on a new homes development it usually stands at the site entrance or on the approach road, carrying the development name and the housebuilder's brand. We design, print and finish totems in-house at our Newbury factory, together with the flags, banners and entrance signs that go up around them.
A totem has three jobs, and the balance between them shifts as the site sells.
The first is to mark the development. A driver on the approach road should know the name of the site and who is building it before reaching the entrance, and a totem placed on the approach does that before the show homes come into view.
The second is to carry the message of the moment. "Show homes open", "Phase two now released" and "Final homes remaining" are all temporary, and a totem can carry them on a panel of their own.
The third is to direct visitors. Once the first residents move in, the site has two kinds of traffic: people coming home and people coming to view. A totem at the right junction sends visitors to the sales centre or marketing suite and keeps them out of residents' streets. That is why our main and pre-site marketing range describes totems as a way to manage customer flow and way finding.
Decide where the totem will stand before you choose a design, because the position sets its size and layout. The aim is a spot where drivers can read it in good time to slow down and turn in. On a fast road that means placing it well before the junction and using larger lettering; on a quiet estate road it can sit close to the entrance. Keep it clear of the view drivers need when they pull out of the site, and check that hedges, parked cars and site cabins will not hide it.
If traffic approaches from both directions, a double-sided totem carries the message on each face. If the site is reached from one direction only, a single-sided totem angled towards oncoming traffic is enough. Keep the wording short. A driver passing at speed will take in the development name, the housebuilder's logo and perhaps one message, so leave longer details such as opening times for the hoarding and the sales centre.
Totems range from a printed panel fixed between two posts to a fully fabricated unit with a built body and raised lettering. A panel on posts is quicker to produce and suits a short campaign or an early phase. A fabricated totem has more presence, and suits a development that will be selling for several years or homes where the signage should reflect the finish of the houses.
Our in-house design team can advise on the materials, lighting and fixings that suit your site, and nothing is made until you have approved the visuals.
In the winter months it gets dark in the late afternoon, and an unlit totem is hard to read from the road after dusk. Lighting keeps the development visible for the whole of the sales day.
One method we use is fret-cut illumination: the lettering is cut out of the face, backed with acrylic and lit evenly from inside by an LED light sheet. A lit totem needs a power supply at the entrance, so plan the cable route before the paving and planting around the entrance are finished. Lighting also affects consent, which is covered below.
A development sells in stages, and the totem should keep up with it. Ask for the development name and brand to sit on the main body, with the changing messages on separate panels that can be swapped. When phase two launches or the final homes go on sale, a new panel in the same colours replaces the old one, and the rest of the totem stays as it is.
A totem works best as part of a set. Flags, entrance signage, hoarding, Heras fence banners and the signage on the sales office should share the same colours, typeface and logo. Because we make all of them in Newbury, they can be ordered together and matched to each other. Our marketing suite signage covers show home fascias, internal wall logos and lifestyle graphics for the sales office.
A totem is an advertisement, so it comes under the advertisement consent rules. In England, some signs on a housing site have deemed consent, which means they need no application if they meet set conditions. A development can fly one flag if it has up to 10 homes, two if it has up to 100 and three if it has more, each flag no larger than 2 square metres on a single flagstaff no more than 4.6 metres high, though not in a National Park, an Area of Outstanding Natural Beauty, the Broads, a conservation area or an area of special control. Small, unlit signs directing buyers to the site can go up within two miles of its main entrance, provided the local planning authority has been told in writing at least 14 days before they first appear. A board about the building work and a sale board are allowed within limits on their size and number, but neither may be lit, so a lit totem needs express consent from the local planning authority. Wales, Scotland and Northern Ireland have separate rules. For how deemed and express consent work, see our post on planning permission for signs.
Our own teams carry out the installation. A survey comes first, so they arrive with the right access equipment for the site. The electrics in a lit totem are tested in our factory and again once it is in place, and we photograph the work before and after.
Agree the end date at the start as well. When the last homes are sold the totem should come down, and its removal is easier to plan alongside the installation than to arrange once the site team has moved on.
To discuss totems for a development, or a full set of site signage, contact our team with the site plan and your phasing, and we will come back to you with visuals and a quote.
← Back to The Kremer Journal